Resource: The Tunnel Challenge
Media Type:
HTML Interactive
Size: 529.0 KB
Teachers' Domain, The Tunnel Challenge, published January 22, 2004, retrieved on ,
http://www.teachersdomain.org/resource/phy03.sci.phys.mfw.bbtunnelchal/
- Background Essay
- Questions for Discussion
- Standards
The amount of time an excavated passage will stand unsupported -- called stand-up time -- is an important consideration in tunneling. Solid rock, though hard to dig through and remove, has excellent stand-up time and may require no structural support during or after excavation. Loose gravel and wetter soils, however, such as the silt and mud found under water, have very little, if any, stand-up time. When the ground cannot stand up on its own, tunnel builders must construct a tube of reinforced concrete or other strong material as they dig the hole. This ensures the permanence and safety of the tunnel.
The 32-mile Channel Tunnel, a rail tunnel constructed under the English Channel, is the longest underground tunnel ever built. French and British tunneling teams employed specially designed tunnel boring machines (TBMs) to complete the task. A TBM's rotating cutting head loosens material from an earth or rock face and deposits it onto an outgoing conveyor belt. A second conveyor belt carries in lining material -- in this case thick, concrete tiles -- to stabilize the tunnel's inside walls. Working in this way, each Channel Tunnel team left a completely finished cylindrical passage as it advanced toward a central meeting point. The Channel Tunnel project proved to be a remarkable technical achievement, even more so considering the British team encountered weak, wet chalk in places despite extensive ground samples that suggested they would be digging through a soft, dry layer made of chalk and clay.
Teachers' Domain is proud to be a Pathways portal to the National Science Digital Library.
Please answer this survey question:
Thank you!
Your response has been received. Thanks for helping improve Teachers' Domain!
Source: Building Big Web site
Resource Produced by:
Collection Developed by:
Collection Funded by:



Print Background Essay
Loading Standards